Concrete batching plant KARMEL 30K

Technical specifications of KARMEL 30K
| Characteristic | Indicator |
|---|---|
| Productivity | 30 m³/h |
| Mixer type | Twin-shaft/Planetary/Rotor [750/500 l] |
| Dosing system | Automatic |
| Aggregate storage bins | 3x10 m³/4x20 m³/5x20 m³/6x20 m³ |
| Cement silos | 1-3 pcs. of 30/40/50 tons |
| Water dosing | Automatic, digital control |
| Material transportation system | Belt conveyor |
| Automation | PLC controller, remote control |
| Installation and commissioning | 10 days |
| Discharge height | 3.8 – 4.15 m |
| Power | 50 kW |
| Dust protection system | Built-in filtration system |
Concrete Batching Plant KARMEL 30K — solution for stable concrete production up to 30 m³/h
Concrete batching plant KARMEL 30K is a compact stationary turnkey concrete plant that provides productivity up to 30 m³/h with controlled mix quality and predictable production cost. Based on our experience, such plants meet the key demand of small and medium businesses: quick start without overspending on infrastructure.
Key advantages of KARMEL 30K for business
Technical audit shows that 18–25% of losses in concrete production occur due to unstable dosing and material logistics. KARMEL 30K solves this thanks to:
- automated dosing system with PLC controller
- belt conveyors for continuous feeding of aggregates
- optimized geometry of the mixing unit
- cement silos with dust filters (compliance with EN 1097, EN 206)
We have noticed a trend: companies switch to local mini-plants to reduce logistics costs by up to 30% and improve quality control.
Technical specifications and efficiency
Main plant parameters
- Productivity: up to 30 m³/h
- Mixer type: twin-shaft/planetary/rotary
- Control system: automatic (SCADA/PLC)
- Dosing accuracy: ±1% for cement, ±2% for aggregates
- Operating temperature range: from -20°C to +40°C (winter options)
How the turnkey concrete plant start-up proceeds
- Design (geology, loads, BIM model)
- Manufacturing and equipment completion
- Installation (10–20 days depending on site)
- Commissioning and calibration
- Staff training and service support
Based on our experience, the full start-up cycle takes 30–45 days.
Where KARMEL 30K provides maximum ROI
- Local construction companies
- Precast concrete manufacturers
- Road construction (concrete pavements, bases)
- Projects with limited logistics
Technical audit shows: switching to own concrete production reduces dependence on suppliers and stabilizes construction schedule.
FAQ — questions clients really ask
Is 30 m³/h enough for commercial projects?
Yes, for most local sites this is an optimal balance between productivity and investment.
What is the actual payback period?
On average 12–18 months with a load of 60% or more.
Does the plant operate in winter?
Yes, if a winter version is available.
What are the maintenance costs?
About 3–5% of the equipment cost per year with regular service.
Is it possible to scale production?
Yes, the design allows adding silos, hoppers, and automation without a complete system replacement.